Problem |
Hint |
3) A builder orders 2 by 4 lumber for a project and always tags on an extra 5% rounded up just in case. If the total number of 2 by 4s is 625 how many of those are extra 2 by 4s that the builder may not need?
|
Let A = the number of 2x4s necessary for the project, without the extras. Then the equation is:
_______________
A = _________
625 is _____ more than this value of A.
|
4) A sequence is created as follows:
What is the distance between the 9th and 10th term of the sequence when plotted on a number line?
Express your answer as a fraction.
|
- Evaluating the 4 terms:
1, .5, .75, .625
- The difference between these terms is:
- Each difference is _____ the previous difference, so the expression for the differences is:
D = _________
- Evaluating this expression for
n = 9:
D = _______________
|
5) A government program has a cost overrun of 0.3% on a total budget of 2 billion dollars. What will the overrun cost the tax payers? Express your answer in scientific notation.
|
Express the 2 billion and the .3% overrun in scientific notation and multiply them together:
= _____________ dollars.
|