|
Washington State Math Olympiad Hints and Solutions 2015 Grade 7 Measurement
|
|
Problem |
1) It takes 4 hours for three members of Jo's crew to paint the walls of a square room with a side
length of 12 ft and a 10 ft ceiling. How long would it take a crew of five to paint the walls of a
square room with a side length of 25 ft and a 12 ft ceiling? (Assume there are no windows and they
paint over doors, etc)
|
2) If May 2nd 2015 is a Saturday, what day of the week will August 23rd, 2016, fall on?
|
3) Peter prepares packages measuring 8 in by 10 in by 14 in for
shipping. He ties each package as shown in the figure with a
continuous length of twine, secured with an efficient knot on top of the package that is 3 in long. If twine comes in 500 ft rolls, how many rolls will he need to prepare 800 packages?
|
|